Projects

Updated: Sep 2025 — QLD & NSW. Representative summaries only; identifiers withheld for probity.

$1.5B+
Programme value overseen
~5,600 km
Road network assessed (flood-impacted)
10+ years
Transport & infrastructure delivery
Panels
TMR • NSW Gov (PWA) • Local Buy • CoGC
RPEQ/ISO
9001 • 45001 • 14001

We work with TMR, BCC, PWA and City of Gold Coast, among others. Project titles and contract references are anonymised; descriptions indicate role, scope type and outcomes.

Selected Projects (anonymised)

Station precinct capacity uplift — anonymised

Station Precinct Capacity Uplift (SEQ)

Role: Project Management • Agencies: TMR / state rail / local government

Client-side programme controls for staged park ‘n’ ride expansion — balancing operations, safety and acceptance.

StationsPark ‘n’ Ride$50m–$100m+
  • Programme & risk dashboards, acceptance trackers, variance control
  • Interfaces across transport agencies and utilities
  • Asset handover packs and operational readiness support
Signalised intersection upgrade package — anonymised

Signalised Intersection Upgrade Package (Metropolitan)

Role: Project Management • Agencies: BCC / state transport

Safety and capacity upgrade package with staging near sensitive land uses; coordinated approvals and close-out.

IntersectionsSafety$10m–$30m
  • Staging & traffic interfaces, utility adjustments, approvals pathway
  • Assurance and acceptance documentation through commissioning
Veloway / AT connection — anonymised

Veloway / Active Transport Connection (Urban)

Role: Project Management • Agencies: BCC / CoGC

New active transport links integrated with urban frontage improvements, wayfinding and safety treatments.

Shared PathsVeloway$5m–$20m
  • Stakeholder engagement and design development coordination
  • Programme alignment with adjoining upgrades and acceptance
Flood recovery roads & bridges — anonymised

Flood Recovery — Roads & Bridges (Northern Region)

Role: Contract Administration • Agencies: PWA (state public works), collaboration with national research bodies

CA and documentation leadership for a multi-package recovery programme spanning an extensive regional road network.

RecoveryResilience~5,600 km assessed
  • Scope & variation control across multiple packages and suppliers
  • Network condition assessment planning and QA (~5,600 km)
  • Claims, audit-ready records and acceptance documentation
Highway corridor works — anonymised

Highway Corridor Works (Regional)

Role: Contract Administration • Agencies: state transport / local councils

Pavement rehabilitation and intersection treatments delivered under time-bound funding windows.

HighwaysIntersections
  • Progress verification, change control and claims support
  • Defect close-out and acceptance packs
Inspections & certification — anonymised

Inspections & Certification Programme

Role: Civil Engineering • Scope: Form 15/16, as-constructed reviews

Site inspections, structural/civil certification and documentation for acceptance.

Form 15Form 16QA
  • Field inspections, rectification follow-up and sign-offs
  • Consolidated packs for council and asset-owner acceptance
Retail facade — structural review (legacy)

Retail Facade — Structural Review (Legacy)

Role: Civil/Structural • Sector: Commercial / Retail

Independent structural review and buildability inputs for a large retail facade.

StructuralCommercial
  • Detail review, staging advice and QA close-out
  • Handover documentation
Large-format retail structure — legacy

Large-Format Retail Structure (Legacy)

Role: Civil/Structural • Sector: Commercial / Retail

Buildable structural documentation and coordination with services & fit-out.

StructuralRetail
  • Constructability inputs for programme and cost certainty
  • As-built verification and sign-off support
Visualisation pack — legacy roads

Visualisation Pack — Legacy Roads

Role: Civil/Visual • Sector: Transport

3D visuals supporting option selection and consultation for road upgrades.

VisualisationTransport
  • Render packs aligned to programme milestones
  • Stakeholder & community engagement support

Digital / AI / Drone

Programme Visuals & Aerials: drone progress, risk visuals and stakeholder-ready extracts.

3D Corridor & Options: models for consultation, staging and acceptance readiness.

Have a package or programme to deliver?

We align scope, stakeholders and acceptance for a clean handover.